WCFIX Plus | Jung Pumpen
Sewage lifting station for wastewater containing faeces

WCFIX Plus

Sewage lifting statin for limited use

For connecting toilet, washbasin, shower or bidet
Invisible in the pre-wall installation or with direct connection
to the stand-alone WC
Made in Germany

  • For pre-wall installation or fitting directly behind a floor-standing WC
  • Powerful motor
  • 19 mm free passage
  • Runtime monitoring with acustic alarm and potential-free alarm contact
  • Vent valve and active carbon filter
  • Maintenance friendly
  • Integrated swing-type check valve

The WCfix plus can be fitted in a pre-wall system or connected directly to a floor-standing toilet with a minimum flush volume of 6 litres. This allows an additional WC or an additional bathroom to be installed almost anywhere during renovation or alteration work. When installed below the backup level, the device also provides anti-flooding protection.
Pumping is particularly quiet due to its flow-optimized open centrifugal impeller. Due to this design, regular cleaning is not necessary and servicing works are significantly reduced.
Due to the restricted use, the installation is only permitted if the number of users is small and an additional WC above the backup level is available to them. According to EN 12050 Part 3, the following sanitary products can be connected:
• 1 WC
• 1 washbasin
• 1 shower
• 1 bidet
These are required to be located in the same room. According to EN 12050 Part 3, washing machines or bathtubs must not be connected.
The WCfix plus is equipped with a runtime monitoring for early acoustic fault signalling. It is also possible to pass on the fault signal to other places via a volt free contact fitted as standard. The appliance is fully pre-assembled, ready for connection to a power socket, and operates fully automatically as soon as the flush is actuated. When installed in bathrooms or shower rooms, the corresponding German VDE regulations must be observed.
Attention: Do not flush any hygenic products down the toilet, because they can cause malfunctions!
For the installation and and for maintenance work a sufficiently large inspection opening has to be planned (accessory).

Scope of supply

Appliance including pump complied with EN 12050, ready to connect with cable and plug, complete with collars, outlet elbow, swing-type check valve 1¼", ventilation insert, active carbon filter, clamps and fixing materials for buoyancy control.

Technical data
Delivery head Hmax
6 m
Flow rate Qmax
12 m³/h
Free passage
19 mm
Pressure outlet
DN 32

Specifications can be changed without notice. Performance subject to ISO 9906 tolerances.

The minimum flow velocity in the pressure piping must be 0.7 m/s according to EN 12056.
This data is represented in the performance curve as a limit of application.

1 results

TypeCode No.
JP45367

Always well informed!

Subscribe to our newsletter


Direct contact

Sales Hotline

Fon + 49 5204 / 17-160

Sales E-Mail

sales.jp@pentair.com

JUNG PUMPEN GmbH

Industriestraße 4-6
33803 Steinhagen
Germany
Fon +49 5204 17-0
E-Mail info@jung-pumpen.de