In 2012, Pepperl & Fuchs Kft. decided to expand its production hall in Veszprém. The construction work included enlarging the factory kitchen and canteen, extending social rooms, building a loading ramp, and constructing a fire water reservoir.

Project Completion: May 10, 2013
Location: H-8200 Veszprém, Kistó út 18
Participants: Main contractor KÉSZ Építő és Szerelő Zrt.

Challenge

Gravity drainage for wastewater from the kitchen and sanitary facilities, as well as rainwater from the loading ramp, was not possible due to insufficient slope. A reliable and durable solution for the wastewater lifting station and rainwater drainage was required.

Our Solution

For the wastewater lifting station, the Jung Pumpen MultiFree 25/2 AW was selected.

  • Features: Vortex impeller, DN65 pressure connection, 65 mm free passage, clog-resistant – ideal for demanding industrial drainage applications.

For rainwater drainage at the loading ramp, Jung Pumpen US 62 D pumps were installed.

  • Features: Vortex impeller, suitable for pre-filtered rainwater, available in single-phase and three-phase versions, optional built-in float switch.

Additionally, Jung Pumpen provided a solution for water level control in the fire water reservoir to compensate for evaporation losses. This is achieved through precipitation and, during dry periods, by feeding tap water into the reservoir.

Installed Products

  • 2 × MultiFree 25/2 AW + 2 × GR65 (wastewater sump)
  • 1 × MultiFree 25/2 AW (reserve)
  • 2 × US 62 D + 2 × GR40 (rainwater sump)
  • Control system for fire water reservoir

 

 